We help the world growing since we created.

China Astm A106 Seamless Pipe Factory – Boiler Seamless Steel Tube Supplier – Wald

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

With a positive and progressive attitude to customer's interest, our enterprise continually improves our products excellent to meet the wants of customers and further focuses on safety, reliability, environmental requirements, and innovation of A106 Carbon Steel , Seamless Steel Tube , Seamless Mild Steel Tube , We are confident that there will be a promising future and we hope we can have long term cooperation with customers from all over the world.
China Astm A106 Seamless Pipe Factory – Boiler Seamless Steel Tube Supplier – Wald Detail:

Overview

Place of Origin: Shandong, China
Application: Fluid Pipe, Hydraulic Pipe, Gas Pipe, OIL PIPE, Fluid Pipe ,Hydraulic Pipe ,Gas Pipe
Alloy Or Not: Is Alloy
Section Shape: Round
Standard: AiSi, ASTM
Certificate: API, ce, JIS, ISO9001
Grade: 20#,45#
Surface Treatment: Cold Drawn, Hot Rolled Cold Rolled
Processing Service: Cutting
Oiled or Non-oiled: Non-oiled

Invoicing: by actual weight
Delivery Time: 61-90 days
Keyword: Seamless Steel Pipe
MOQ: 1 Ton
Length: 5-12M
O.D.: 1/8”–24”
Material: 10#,20#,45#,Q345 ,16Mn,Q295
Packing: Bundles
Supply Ability: 40000 Ton/Tons per Year
Port: Qingdao Shanghai Tianjin

Application

6

Warehouse

packaging

Products Show

Our Services

1. Free sample can be supplied
2. Trial order  is acceptable
3. Third party test is acceptable
4. Delivery time guarantee

FAQS

1. How can I get a quotation from you ?
You can leave us message, and we will reply every message in time. Or we may talk on line by Trademanager.
And you can also find our contact information on contact page.

2.Can I get samples before order ?
Yes, of course. Usually our samples are free. we can produce by your samples or technical drawings. We can build the molds and fixtures.

3. what is your delivery time ?
The time of delivery is usually around 1 month(1*40FT as usual).
We can send out in 2 days, if it has stock.

4.What is your payment terms?
Our usual payment term is 30% deposite, and rest against B/L. L/C is also acceptatble.EXW,FOB,CFR,CIF,DDU.

5 How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,?
no matter where they come from.

Please feel free to leave us message if you have any question about us and our products.


Product detail pictures:

China Astm A106 Seamless Pipe Factory –  Boiler Seamless Steel Tube Supplier  – Wald detail pictures

China Astm A106 Seamless Pipe Factory –  Boiler Seamless Steel Tube Supplier  – Wald detail pictures


Related Product Guide:

Adhering into the theory of "quality, services, efficiency and growth", now we have gained trusts and praises from domestic and international shopper for China Astm A106 Seamless Pipe Factory – Boiler Seamless Steel Tube Supplier – Wald, The product will supply to all over the world, such as: UAE, Barbados, Jeddah, The products has a good reputation with competitive price, unique creation, leading the industry trends. The company insists on the principle of win-win idea, has establishedglobal sales network and after-sales service network.
  • The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
    5 Stars By Clementine from Somalia - 2017.11.20 15:58
    Company director has very rich management experience and strict attitude, sales staff are warm and cheerful, technical staff are professional and responsible,so we have no worry about product,a nice manufacturer.
    5 Stars By EliecerJimenez from Manila - 2017.05.02 18:28

    Related Products